Artificial grass construction process


Grass fibers shedding, lint-free
 1, the production process is poor, the artificial turf at the end of poor quality cloth, glue, cause poor overall binding force on the grass;
 2, using low-end grass grass fibers (PP material), use grass line from disconnect;
 3, the excipients used unqualified (quartz sand particles is too large, not round), causing damage to the grass.
Fourth, the bottom of the artificial turf corruption, cracking
 1, the bottom of the artificial turf is thin, and the general PP material;
 2, the bottom of the glue of poor quality or poor gluing process, too much is too thick;
 3, venues foundation rugged to be ineligible on the basis of the end of the artificial grass cloth injury;
 4, the basis of the overall poor drainage, base cloth a long soak in water.
Venue artificial turf serious uneven color, the color difference
 1, the poor quality of the artificial grass fibers, uneven thickness, color instability could easily lead to a different color;
 2, site installation poorly designed, scene accessories populate rugged, produce visual color difference;
 Venues foundation uneven seams obvious traces;
 4, filling excipients failed, the contaminated surface layer;
Artificial turf to interface injustice, the gap is too large
 Venues foundation did not according to the standard requirements, uneven, resulting in uneven interface;
 2, poor artificial turf seams connection process caused by uneven;
 3, artificial grass production process and quality problems caused by deformation can not be straightened, create gaps;
 4, the lack of professional experience in construction, lack of a dedicated construction tools and qualified and skilled technicians.
Venue pan-black surface layer messy
 1, the use of colloidal venues too much or substandard quality, resulting in a large area of ​​black pollution;
 2, local multi-point area off the artificial turf, leaving only filler;
 3, the lack of professional experience in construction, and the lack of dedicated tools and qualified and skilled technicians;
 4, the lack of the necessary maintenance after the construction is completed;